Birth of the CMM

In the mid 1980’s software had become an increasingly larger part of weapons systems and many products. The U.S. DoD was strongly dissatisfied with the outcomes of weapons development projects. This gave rise to the Software Engineering Institute (SEI) and the first Capability Maturity Model (CMM) funded by the DoD.As consequence of all of this, … Read more